Image

Elderly woman dies in London Line crash

October 26, 2018

Lambton OPP now say an 82-year old woman died in the crash on London Line.

Police say around 8:45 am yesterday, a pickup truck traveling east on London Line met a car traveling west. At some point, one of the vehicles veered into the path of the other and the crash occurred.

The driver of the pickup, an 85-year old man from St. Clair and the driver of the car, a 62-year old Sarnia woman were taken to hospital with injuries.

The passenger of the pickup truck, Mary Margaret Mullen, died at the scene.

The OPP Technical Traffic Investigators continue to probe the cause of the crash and ask anyone who might of been in the area at the time to call police.

 

 

 

Share This

Image
Front Page

Marine rescue unit brings Port Lambton boater to safety

October 3, 2026

The 29-foot boat was stranded in the dark near Blue Point There were a few tense moments but a happy ending after a distress call from a Port Lambton boater. The PointSAR Marine Rescue Search and Rescue got a distress call at 3:13 am Saturday. A 29-foot vessel was aground with two people on board. The unit wasn’t able to

Read More

Image
Front Page

Lambton-Kent public school board to hold fewer public meetings

October 2, 2026

Blake Ellis/The Independent The Lambton Kent District School Board will have 15 meetings annually beginning in November. A revised plan was presented to trustees at its Sept 22 meeting after trustees voted down a plan in a 4-4 vote at its Sept. 8 meeting to reduce its schedule from 18 meetings to nine meetings. Trustee David Shortt said the new

Read More

Image
Front Page

Electric Zamboni sweeping East Lambton ice

October 2, 2026

The Independent Warwick Township has a new, much quieter Zamboni cleaning up at the East Lambton Community Complex. The township took delivery of its first ever electric Zamboni recently. The $150,000 machine was ordered in 2025 and the township waited two years for the order to be filled. Parks and Recreation Manager Ryan Chamney says the electric Zamboni is a

Read More

Image
Front Page

Mega road project gone awry, now a mega election issue

October 2, 2026

Cathy Dobson/The Independent As Point Edward residents consider who to vote for, the biggest road redevelopment contract in the village’s history is raising a lot of questions. Reconstruction of five large blocks of St. Clair Street that started in early spring 2024, was expected to last about a year and cost approximately $5.4 million. But more than two years later,

Read More