Image

CN plans big fix in Wyoming, closes road for two days

October 7, 2018

Drivers using Broadway St. in Wyoming be aware – the road will be closed at the CN tracks for two days starting Oct. 10.    Plympton-Wyoming council has long complained about the rough track and now CN plans a big fix. The road will be closed sting Oct. 10 to 12. No traffic, not even emergency vehicles will be allowed to pass over the tracks.

The bumpy track has been fixed several times in the last few years, but each time the pavement around the tracks sinks.

Recently Plympton-Wyoming Council called on residents to call CN to complain about the state of the track.

Share This

Image
Front Page

No ATV rally for Petrolia Ag Society

June 15, 2025

The Independent There will not be ATVs rumbling through Petrolia this summer. Kelly Humphrey of the Petrolia Enniskillen Agricultural Society came to council in mid-May asking if PEAS could host an ATV rally with Greenwood Park as a starting and finishing point and using Petrolia streets to get to the starting and finishing point.  Julie Bullock, director of parks and

Read More

Image
Front Page

Fair banner may not fly

June 14, 2025

The Independent The Moore Agricultural Society has some big plans for the 175th anniversary of the Brigden Fair. But not all of their plans may work out. The ag society has asked for and received several approvals from St. Clair Township council for special events at the landmark fair including allowing a low-level Canadian Armed Forces Flyby and helicopter landings

Read More

Image
Front Page

Remembering Newell Hastings

June 14, 2025

Heather Wright/The Independent Sunday, Newell Hasting’s service to King and Country over a century ago was remembered in a peaceful church cemetery near Watford. Hasting was born in Petrolia and his family moved to Watford around the turn of the century. He signed up to serve in the miltia with Watford’s 149th Battalion before being called up for service. He

Read More

Image
Front Page

Sidewalk projects around First Ave this summer

June 13, 2025

Heather Wright/The Independent Sidewalks along First Street in Petrolia will be getting an upgrade once school is out for the summer. It’s part of the latest large project to improve the town’s sidewalk system. In 2023, BM Ross and Associates completed a study on Petrolia’s sidewalk system and found it lacking. It suggested $1.5 million in sidewalk construction was needed

Read More