Image
Cathy Dobson Photo
Interim Police Chief Mike Federico and Deputy Chief Mike VanSickle face the Sarnia Police Services Board during capital budget discussions Sept. 24, 2026.

Sarnia Police Board seeks $3.5 million to repair station

September 24, 2026

Cathy Dobson/The Independent

A board-approved, $3.5 million reinvestment to repair Sarnia Police headquarters will ensure the building’s use for the foreseeable future, says Interim Chief Mike Federico.

He made the comments Thursday after the Sarnia Police Services board unanimously supported the request to the City of Sarnia to provide $3.5 million for “immediate capital” improvements at the Christina Street building.

“The words ‘Band-Aid’ and ‘short-term repairs’ get thrown out (in public forums) but that’s not the approach and it’s not the recommendation we’re making,” the chief said.

After extensive research and consultation, Federico said he has concluded the existing 39-year-old police headquarters – with significant reinvestment – can continue to serve the City of Sarnia “well into the future.”

For now, that puts to rest the controversial discussion about building a new headquarters, estimated to cost $91 million, that plagued budget talks last year.

“Those discussions were ultimately discontinued, and construction of a new headquarters is no longer under consideration,” Deputy Chief Mike Van Sickle wrote in a report to the police services board.

However, deferring necessary capital work is no longer a sustainable approach,” Van Sickle continued, siting occupational health and safety concerns, security, as well as a recent Ministry of Labour order to replace the front stairs.  

Van Sickle’s report listed numerous high-priority capital repairs and upgrades that he said cannot be delayed. They include:

  • ·       Front entrance and stair replacement;
  • ·       Fuel tank replacement;
  • ·       Refrigerant monitoring system;
  • ·       Sally port expansion and rehab;
  • ·       Parking lot gates and camera coverage;
  • ·       Permanent exterior cam-lock electrical connections for emergency generator; and
  • ·       Panic strips and panic button for officers working with prisoners.

The front entrance stairs are the most visible safety concern for the public. In August, a Ministry of Labour rep went to the police station on another matter and immediately ordered the stairs shut down. The stairs’ deterioration is not limited to the exterior, Van Sickle said.

They are a part of the building structure and leaks have allowed water to seep into the gym beneath them and cause rebar rust and mould, he said.

Structural engineers have estimated the stair replacement will cost $1 million, according to Jason Dale, manager of fleet and facilities.

“We have a ministerial order to fix the stairs. We have no choice,” said police board member Anne Marie Gillis, an incumbent running for city council again. She suggested there could be federal money available for repairs that MP Marilyn Gladu could help access.

“There’s no way around it,” agreed board member Chrissy McRoberts, also an incumbent taking another run at a council seat.  “The longer we wait, the more it’s going to cost. This has to be done.”

Meanwhile, yellow caution tape prevents the use of the stairs. Entry to the building is limited to a ramp.

In making the case for $3.5 million in urgent repairs, Federico said the request “is the least amount of money we need to invest on the building to make it safe to occupy.

“We are just trying to survive in this building,” he said.

The SPS board also approved a 10-year plan Thursday to upgrade the existing station so that the aging structure can be managed. 

The plan will be reviewed annually and includes items such as HVAC improvements, new lockers large enough to handle current equipment carried by officers, window replacement and refurbishments to the criminal investigations division.

None of the items on the capital replacement list address shortcomings like an inadequate shooting range or off-site leased space such as the communications centre in Lambton Mall, Van Sickle added. 

The $3.5 million capital police budget still requires approval from city council as the city is responsible for both the building and police operations.  

A separate budget of $40.9 million is also going to city council for 2027 operating expenses.   It represents a new spending record for the police department and a 5.8 per cent increase over 2026. 

Share This

Image
Front Page

Trustee candidate calls for the return of ‘true’ history

October 14, 2026

Audience member calls the messaging ‘quite alarming’ Heather Wright/The Independent A candidate for the Lambton-Kent public school board says she will “stand strong against the progressive heists of the Canadian education system” including returning to the “history we all grew up with” so students can be proud to be Canadian. Cynthia Workman’s words raised some eyebrows at the Brooke-Alvinston All-Candidates

Read More

Image
Front Page

Lambton College to open more seats in health, STEM, trades

October 14, 2026

The Independent There will be space for about 300 more students in Lambton College next year. Lambton College is among the post secondary institutions which submitted a proposal for more classroom spots for in demand fields. Friday, the province announced 2,077 new spaces across southern Ontario, including 297 at Lambton College; 160 in Health programs, 90 in the STEM field

Read More

Image
Front Page

Worker injured after falling through Sombra greenhouse roof

October 14, 2026

OPP, Ministry of Labour investigating The Independent A worker at a Sombra greenhouse was taken to hospital by air ambulance Wednesday morning after crashing through the roof. St. Clair Township fire officials say the department was called to the Envirofresh Produce greenhouses near CF Industries on the St. Clair Parkway just after 9 am. Chief Richard Boyes says a man

Read More

Image
Front Page

Paving on rebuilt Grand Bend Bridge continues Thursday

October 14, 2026

The Independent Drivers heading to Grand Bend are going to face some traffic slowdowns starting Thursday. The project to widen the bridge has been going on for two years, with work taking place before and after the busy summer tourist season. So far, officials say the concrete work, bridge retaining walls, waterproofing the east half of the new deck and

Read More